Pages Menu
Categories Menu

Posted by in IT Consulting/Engineering, Project Management

Providence College – Schneider Arena

Providence College – Schneider Arena

This design-build project for a division one, state of the art athletic facility encompassed multiple facets of technology based systems including Broadcast Cabling and Equipment including NCAA required video cameras and playback for officials, mobile broadcast studio connectivity, Digital Signage, Displays and Game Clocks, Arena and Local Sound systems, Video capture, storage and coaching software in addition to LAN, Telephony and Wireless next generation 802.11ac equipment, Video Security and Access Control connectivity.

  • A fast-track project with additional design and support for building automation, ice monitoring-management, hydro-therapy and food services.

 

  • Construction administration and Project Management acting as the Owners Representative were key components of our ability to coordinate the various trades and stakeholders while adapting new technologies and systems to existing infrastructure and applications on a very aggressive timetable.

In addition to design and specification work the Skyline group handled several bid packages, RFP’s, Contractor evaluations, technology system assessments and integration coordination along with outside plant work to upgrade pathways, transmission media and service provider connections for CATV, Satellite TV and head-end. The Telecommunications cabling specifications and drawings were developed in accordance with the Providence College Telecommunications Standards.

 

Schneider ArenaSchneider Arena