Pages Menu
Categories Menu

Individual Project Experience

The most important aspect of any consulting and engineering firm is the knowledge and experience of the people who are responsible for the successful completion of the projects being undertaken. The principals of The Skyline Group have extensive experience working on complex, sophisticated and multi-faceted projects for a variety of clients.

The following are descriptions illustrating some of this experience providing clients with services in all areas currently offered by The Skyline Group.

Project Case Study – Schneider Arena Audio-Visual Systems Build-out and Commissioning

Posted by on Nov 4, 2013 in Project Management, Projects, Technology Consulting/Engineering | Comments Off on Project Case Study – Schneider Arena Audio-Visual Systems Build-out and Commissioning

This design-build project for a Division One, state of the art $20 Million-dollar athletic facility encompassed multiple facets of technology-based systems including television network broadcast cabling and equipment. This broadcasting coverage included NCAA required game-day league video cameras and playback for officials, mobile broadcast studio connectivity, digital signage, flat panel displays, game clocks, arena game day video, local sound systems for the luxury suites, video capture and storage and coaching software. In addition, the project encompassed LAN, Telephony, Wireless next generation 802.11ac equipment, Video Security and Access Control connectivity.

This fast-track project also required additional design and support for building automation, ice monitoring- management, hydro-therapy and food services.

Acting as the owner’s representative was the key component giving us the ability to coordinate the various trades and stakeholders while adapting new technologies and systems to existing infrastructure and applications on a very aggressive timetable for the opening of the Ice Hockey season.

 

In addition to the design and specification work, the Skyline group handled several bid packages, RFP’s, Contractor evaluations, technology system assessments and integration coordination along with outside plant work to upgrade pathways, transmission media and service provider connections for CATV, Satellite TV and head-end equipment.

The project specifications and drawings were developed in accordance with the Providence College Infrastructure Standards, Industry best practices and methodologies.

 

The field support team for this project consisted of four members of The Skyline Group including Principal in Charge, Project Manager, Designer and CAD Field Support. We managed this very active design and implementation process in real-time, coordinating with members of the General Contractor, MEP and structural engineers and allied specialty trades including Hoist Controls, Signage, Local Sound and official league video.

 

 

Schneider ArenaSchneider Arena

Providence College – Ruane Humanities, Providence Rhode Island

Posted by on Sep 7, 2013 in Project Management, Technology Consulting/Engineering | Comments Off on Providence College – Ruane Humanities, Providence Rhode Island

IT and A/V Systems Build-out and Commissioning

The Skyline Group provided Information Technology design, project management and construction administration services for the new Humanities Building constructed in the spring of 2012. The building was built on the south west side of the campus next to the Phillips Library and the Hickey, SOWA and Albertus building complex. Construction began in June of 2012 with a completion date of September 2013.

 

This AIA Architectural Award-Winning Project for “Outstanding Design in the Post-Secondary School Category” is a 64,000-square-foot, three-story new construction project that was designed and built from start to finish in 18 months with a budget of ~$20 Million dollars.

 

Work was completed in the summer of 2013 and ready for the start of fall semester classes. Designed and built in an architectural style to complement Providence College’s first building, Harkins Hall.

 

The Skyline team worked as owner’s representatives for the Technology and Audio-Visual Systems infrastructure and were part of the combined group of owners, architects and consultants that brought this campus showpiece to life.

Together we integrated 21st century technology systems for students, faculty and staff into this collegiate gothic styled building with architectural details and aesthetic design considerations to ensure a true to form building with the benefit of state of the art educational and technology tools, Audio-Visual applications and technology services.

 

One of the first campus installations of IEEE 802.11ac Wireless LAN Technology in the country, the building has wireless coverage throughout the premises and in adjacent outdoor classroom areas incorporating custom designed, integrated stanchions for Emergency Call “Blue Light” Phones, CCTV Cameras, Strobes and Wireless Antenna’s.

 

After the initial Programming and Design phases, the Construction Administration and Project Management was handled by the Skyline team acting as the owner’s representative. Key factors in our ability to coordinate the various MEP trades and stakeholders were our on-site, live interactions on a daily basis as the eyes and ears for the owner. We were able to adapt new technologies and systems while maintaining the architectural integrity and vision of the school, its benefactors and architectural team while adhering to a closely managed timetable.

 

In addition to design and specification work, The Skyline Group handled several bid packages, RFP’s, Contractor evaluations, technology system assessments and integration coordination.

 

Working with the A/V Consultant, the commissioning of the A/V Systems through to completion and owner acceptance was a key focus area to ensure integration and coordination of all involved systems and staff that achieved the desired objectives, system design performance and operation criteria

 


After the initial Programming and Design phases, Construction Administration and Project Management performed by the Skyline team acting as the Owners Representative were key components in our ability to coordinate the various trades and stakeholders, adapting new technologies and systems while maintaining the architectural integrity and vision of the school, benefactors and architectural teams while adhering to a closely managed timetable. In addition to design and specification work the Skyline group handled several bid packages, RFP’s, Contractor evaluations, technology system assessments and integration coordination. The Telecommunications cabling specifications and drawings were developed in accordance with the Providence College Telecommunications Master Standards.

 

19-IMG_1082   22-IMG_3064

Providence College Ruane Center for the Humanities Timelapse of Construction

Posted by on Sep 4, 2013 in Project Management, Technology Consulting/Engineering | Comments Off on Providence College Ruane Center for the Humanities Timelapse of Construction

Barnstable County Region-Wide Telecommunications & Information Technology Survey

Posted by on Sep 7, 2012 in Municipalities, Projects | Comments Off on Barnstable County Region-Wide Telecommunications & Information Technology Survey

The Skyline Group (TSG) along with an affiliate consultant was engaged by Barnstable County to conduct a comprehensive survey of all municipal telecommunications and information technology assets, and associated costs for all towns and schools on Cape Cod Massachusetts.

(more…)

Brigham and Women’s Hospital – Carl J. and Ruth Shapiro Cardiovascular Center, Boston, Massachusetts

Posted by on Nov 15, 2008 in Project Management, Projects | Comments Off on Brigham and Women’s Hospital – Carl J. and Ruth Shapiro Cardiovascular Center, Boston, Massachusetts

IS Telecommunications Construction Administration and Project Management Services

 

Our responsibilities include acting as “Low Voltage Representative” for Partners Health Care’s Real Estate Group to provide general oversight of the Construction Manager and Low Voltage Contractor for both the interior and exterior connectivity, Telecommunications equipment procurement, Telecommunications equipment vendors and IS/Telecom departments. We have developed the implementation schedule and on sight documentation of the construction process relating to all telecommunications rooms “Make Ready” and equipment installation.

Providence College – Hickey Hall Renovation, Providence Rhode Island

Posted by on May 13, 2008 in Projects, Technology Consulting/Engineering | Comments Off on Providence College – Hickey Hall Renovation, Providence Rhode Island

Technology Engineering Services for the newly renovated 40,000 square foot “Hickey Hall Chemistry and Biology Labs Building”. Our responsibilities include the design of a Shielded (Foil) Twisted Pair (FTP) cabling system, cable tray design, coordination with the Architect and the General Contractor for structured cabling to lab benches and peripheral devices and the redesign effort for the expansion of the existing telecommunications room for current and future infrastructure needs. Our deliverables include T-Series drawings, cabling specification and Request for Proposal (RFP) and bidder evaluation and recommendation.

Providence College (PC), Providence, Rhode Island: Siena Hall

Posted by on Jul 14, 2006 in IT Consulting/Engineering, Technology Consulting/Engineering | Comments Off on Providence College (PC), Providence, Rhode Island: Siena Hall

Structured Telecommunications, Data, and Security Cabling and Security System

Construction Drawings Completed Summer 2006 (more…)

Major World-wide Defense Contractor, Fiber Optic Expansion to Two New Facilities, Burlington and Woburn Massachusetts

Posted by on Apr 5, 2005 in Projects, Technology Consulting/Engineering | Comments Off on Major World-wide Defense Contractor, Fiber Optic Expansion to Two New Facilities, Burlington and Woburn Massachusetts

The Skyline Group provided fiber optic aerial design, permitting, and owner’s agent services through construction for a fifteen-mile expansion of the clients existing statewide fiber optic network into two new facilities in Burlington and Woburn Massachusetts. The project was completed on time and on budget and provided significant client savings based on our approach and execution.

Hanscom Air Force Base Fitness Center, Bedford, Massachusetts

Posted by on Jan 13, 2005 in IT Consulting/Engineering, Project Management, Project Management, Technology Consulting/Engineering | Comments Off on Hanscom Air Force Base Fitness Center, Bedford, Massachusetts

Complete Telecommunication Infrastructure for Distribution Center

Design Completed January 2005 (more…)

Yale School of Medicine, New Haven Connecticut

Posted by on Dec 13, 2004 in IT Consulting/Engineering, Technology Consulting/Engineering | Comments Off on Yale School of Medicine, New Haven Connecticut

Provided on going engineering service for multiple renovation projects throughout the School of Medicine. The scope for these projects consisted of site evaluation of the current structured cabling system in the area’s, floors or buildings to be renovated. The evaluation included coordination with the Yale Telecommunications staff, the Mechanical, the Electrical and the Plumbing Engineers to include Telecommunications outlet locations and type, space requirements for the proposed cabling system or cable tray, electrical outlet requirements at the workstations and Telecommunications Rooms, lighting requirements for the TR’s and any plumbing or piping removal at the new TR location. The design included the feasibility of reusing existing cabling (both ISP and OSP), additional cabling requirements or complete re- cabling of the proposed renovation for budgetary and bidding purposes.