Higher Education Data Center

Posted by on Nov 20, 2015 in IT Consulting/Engineering, Projects | Comments Off

Network Core Migration and Physical Infrastructure Management                        

Summer 2015

 

This Higher Education Data Center had two key areas of focus related to their legacy infrastructure. The Network Core was in need of updating to create physical separation of key components and services for redundancy and security and the data center did not have a centralized means to gather information on the status of manageable IT infrastructure devices such as UPS, Metered Power Strips, Cooling units, and Environmental sensors.   The data center operators and managers required visibility into the managed devices with appropriate monitoring, measurement, reporting, and alerting tools to effectively operate and manage resources and systems.

 

A full evaluation of the existing data center infrastructure was performed and the results reported to the client with two suggested options for managing the physical infrastructure. Both options would allow the project to be completed on time and within budget. The client selected the option that minimized the disruption of services by utilizing pre-terminated cable assemblies to cross connect between the existing campus backbone connections and new secure network core locations. The secondary objective was to clean up pathways, eliminate large quantities of jumpers (patch cords) and organize the core cross connections. These objectives were realized with careful preplanning and staging of the work and the work was completed while maintaining the integrity of the existing campus backbone cable terminations to over 50 buildings.

The Scope of work included: Identify and develop the tasks and procedures required to support the College in the cutover of the core switches. Work with each stakeholder entity on tasks related to the cutover of the core switches and WAN services to insure completion in a timely fashion while maintaining service levels through precise scheduling and phased cutovers. Flow charting processes and tasks, provide and update network topology and as-built drawings including Cabinet Elevations, Cross-Connect Schedules and Equipment Lists. Coordinate with allied trades and internal departments on scheduling, material acquisition, preparation and staging so that all tasks associated with the completion of the cutover of the core switches could be completed according to the scheduling and service objectives on the days and times assigned. Research and provide solutions for Data Center Infrastructure Management (DCIM) including resource and component identification, manufacturer and product set evaluation and capabilities assessment, systems integration and configuration options. Participation in supplier interviews, selectivity and budget development for a phased implementation program.

Tier III Data Center

Posted by on Jul 31, 2014 in IT Consulting/Engineering | Comments Off

This multi-phased build-out of a new disaster recovery hot site for a global financial services company was a fast-track project (more…)

Providence College – Schneider Arena

Posted by on Nov 4, 2013 in IT Consulting/Engineering, Project Management | Comments Off

This design-build project for a division one, state of the art athletic facility encompassed multiple facets of technology based systems including Broadcast Cabling and Equipment including NCAA required video cameras and playback for officials, mobile broadcast studio connectivity, Digital Signage, Displays and Game Clocks, Arena and Local Sound systems, Video capture, storage and coaching software in addition to LAN, Telephony and Wireless next generation 802.11ac equipment, Video Security and Access Control connectivity. (more…)

Ruane Center for the Humanities

Posted by on Sep 7, 2013 in IT Consulting/Engineering, Project Management | Comments Off

This Architectural Award Winning Project for “Outstanding design in the post-secondary school category” is a 63,000-square-foot, three-story new construction project that was designed and built in 18 months with work completed in the summer of 2013. (more…)

Barnstable County Region-Wide Telecommunications & Information Technology Survey

Posted by on Sep 7, 2012 in IT Consulting/Engineering, Municipalities | Comments Off

DEFINE

The Skyline Group, Inc. (TSG) along with an affiliate consultant was engaged by Barnstable County to conduct a comprehensive survey of all municipal telecommunications and information technology assets, and associated costs for all towns and schools on Cape Cod. (more…)

Brigham and Women’s Hospital – Carl J. and Ruth Shapiro Cardiovascular Center, Boston, Massachusetts

Posted by on Nov 15, 2008 in Project Management | Comments Off

ISTelecommunications Construction Administration and Project Management Services Our responsibilities include: acting as “Low Voltage Representative” for Partners Health Care’s Real Estate Group with responsibilities to provide general oversight of the Construction Manager, (more…)

Providence College (PC), Providence, Rhode Island: Hickey Hall

Posted by on May 13, 2008 in IT Consulting/Engineering, IT Consulting/Engineering | Comments Off

Tel / Data Engineering Services

Project Completed Spring 2008 (more…)

Providence College (PC), Providence, Rhode Island: Siena Hall

Posted by on Jul 14, 2006 in IT Consulting/Engineering, IT Consulting/Engineering | Comments Off

Structured Telecommunications, Data, and Security Cabling and Security System

Construction Drawings Completed Summer 2006 (more…)

Major World-wide Defense Contractor, Massachusetts

Posted by on Apr 5, 2005 in IT Consulting/Engineering, IT Consulting/Engineering, Project Management, Project Management | Comments Off

Fiber Optic Aerial Design, Permitting and Client Agent Services

Construction Drawings Completed Spring 2005 (more…)