Pages Menu
Categories Menu

Posted in IT Consulting/Engineering

Newton-Wellesley Hospital (NWH), Wellesley, Massachusetts

Low Voltage Cabling Construction Documents and Request for Proposal for Medical Oncology

Project Completed October 2009

DEFINE
The scope of the project was to provide prudent design documentation for the Vernon Cancer Center Medical Oncology Building Lower Level and Ground Level at NWH, who worked in collaboration with New England Hematology and Oncology Associates (NEHOA).

DESIGN
Provided programming details for low voltage outlet requirements at user group meetings.

Created a set of LV-Series drawings from the provided E-Series drawings for the lower level and ground level.

DEPLOY
Arranged and facilitated joint meetings with NWH Information Technology team: reviewed and revised drawings and specifications until accepted.

Produced detailed room layouts on part plan drawings: included cabinet (or rack) locations, low voltage cabling pathway design, and electrical outlet locations.

Provided ongoing coordination with the architect and MEP engineers for the HVAC requirements, the locations of telecommunications outlets, cabling pathways, and the location details for all Telecom Rooms.

Competently organized and attended Construction Administration visits.

DOCUMENT
Disseminated RFP to the GC for bid to qualified contractors.

Evaluated and recommended best qualified contractor to NWH.

Precisely reviewed and documented progress of all construction phases.

Provided site visit reports to NWH from Construction Administration visits.