Major World-wide Defense Contractor, Massachusetts

Fiber Optic Aerial Design, Permitting and Client Agent Services

Construction Drawings Completed Spring 2005

DEFINE
The scope of the project was to provide a cost-effective fiber optic aerial design, permitting, and act as Clients’ agent services for construction of a fifteen mile expansion of Clients’ existing statewide fiber optic network between two new facilities.

DESIGN
Completed field survey of proposed route and collected required information for Verizon and local Municipal Electric Company for their Pole Attachment License Application and Underground Lease Application to create construction plans.

Prepared and submitted application to Verizon and Local Municipal Electric Company to initiate a pre-construction survey for the aerial routes and an Underground Application to phone company for conduit use along roadway.

Completed and filed appropriate Grant of Location Applications in the City for the installation of any subsurface conduit within the public way.

Finalized and submitted petitions for installation of the aerial attachments to be filed with the Town.

Assisted in the preparation and filing of the appropriate Grant of Location Applications in the City for the installation of any subsurface conduit within the public way.

Constructed drawings of the route, detailing the fiber optic cable requirements and installation parameters, including review of AutoCAD files with a key map showing the route in its entirety.

Prepared detailed specifications of the Client’s cable and installation requirements.

Managed RFPs with specifications and drawings to support the bidding process to three (3) telecommunication construction contractors.

DEPLOY
Explored alternate feasible routes along public ways within the effected municipalities to determine existing aerial routes, ease of construction, and included review of railroad ways and existing underground conduit, all as potential cost saving measures for Client.

Organized and participated in pre-construction survey done by Verizon Field Engineers and Town Municipal Light.

Conducted meetings with contractors on regular consistent timely basis.

Organized and facilitated meetings with Client on regular timely basis, as well as on demand.

Provided ongoing coordination with the multiple providers and contractors to ensure project execution accuracy and timely completion.

DOCUMENT
Explored alternate feasible routes along public ways within the effected municipalities to Provided feasibility study to Client of recommended route for review and selection of final route.

Recommended preferred most qualified cost-effective contractors to Client after reviewing all bids.

Precisely reviewed and documented progress of all construction phases.

Thoroughly documented project approach and execution, which resulted in project completion on time and on budget with significant savings for the Client.