Providence College – Ryan Center for Business Studies, Providence Rhode Island

Providence College – Ryan Center for Business Studies, Providence Rhode Island Tech PM NEW

The new home of the Providence College School of Business program construction on the 64,000-square-foot, four-story building is an addition to a renovated former Dormitory Building.

Featured spaces of the combined building project include active learning classrooms, multi-function atrium, finance lab, offices, multiple student breakout spaces, kitchen, and a cafeteria.

We provided design services for the new Audio-Visual systems as well as building utilities, LAN connectivity and design and project management acting as owner’s representatives for all technology systems installed in the building.

Construction began in October 2015 of the $30-million project and was completed in January of 2017.

Read More

Posted by in Project Management, Projects, Technology Consulting/Engineering

Brown University– School of Engineering, Providence Rhode Island

The new 80,000 square foot building was built adjacent to and connect to the existing Barus & Holley complex. The new building included cleanrooms, core research facilities, high tech research labs and open spaces for micro/nano-technology, biomedical engineering, energy and the environment, information technology for the future and entrepreneurial innovation. Working with Shawmut Design and Construction (SDC), TSG provided Security System design services for the new School of Engineering building constructed on the Campus of Brown University. The Integrated Project Delivery (IPD) design concept included coordination with the Brown University Department of Facilities Management and the Safety and Security Department, SDC, Kieran Timberlake Architects and various trade groups to complete the design/build project. Project Approach and Scope Our approach was consistent with our experience for similar projects in scope and commitment. The project required an owner’s representative style approach to collaborate with the project stakeholders and trade partners and to design the security system as one entity. We understood the value of collaboration and commit to working as a team in the best interest of the project.

Read More

Posted by in Project Management, Projects, Technology Consulting/Engineering

Providence College – Ruane Friar Development Center, Providence Rhode Island

The new 70,000 square foot Friar Development Center will house the Providence College Men’s basketball practice and support facility and expanded career service center serving both the student and the student athlete. The Skyline team provided Audio Visual systems, practice court technology, building utility connectivity as well as LAN Technology Services Qualifications Page 55 in-building design documents suitable for bid to technology system providers. Our effort started with the enabling phase and worked in conjunction with Providence College Capital Project Group, Academic Media Services, Men’s Basketball management team, Perkins Eastman Architects and MEP Engineers. We utilized PC design standards to develop construction and bid documents for all technology systems included in the project. We provided on-site owner’s representation project management services for the entire technology system build-out. Our project team consisted of Joe E Mello as Project Manager, James Katseff, RCDD as Project Manager, Tim Baeta, CTS as Project Designer.

Read More

Posted by in Project Management, Projects, Technology Consulting/Engineering

Confidential Banking Center– Tier III Data Center, North Carolina

Project Case Study – Tier III Data Center MEP Coordination and Design Development This multi-phased build-out of a new disaster recovery “hot site” for a global financial services company was a fast-track project with critical timetables and coordination with multiple stakeholders to bring a new site on-line while an existing facility was being decommissioned, maintaining uninterrupted services, applications and reliability. 

Read More

Posted by in Project Management, Projects, Technology Consulting/Engineering

Project Case Study – Schneider Arena Audio-Visual Systems Build-out and Commissioning

This design-build project for a Division One, state of the art $20 Million-dollar athletic facility encompassed multiple facets of technology-based systems including television network broadcast cabling and equipment. This broadcasting coverage included NCAA required game-day league video cameras and playback for officials, mobile broadcast studio connectivity, digital signage, flat panel displays, game clocks, arena game day video, local sound systems for the luxury suites, video capture and storage and coaching software. In addition, the project encompassed LAN, Telephony, Wireless next generation 802.11ac equipment, Video Security and Access Control connectivity.

This fast-track project also required additional design and support for building automation, ice monitoring- management, hydro-therapy and food services.

Acting as the owner’s representative was the key component giving us the ability to coordinate the various trades and stakeholders while adapting new technologies and systems to existing infrastructure and applications on a very aggressive timetable for the opening of the Ice Hockey season.

 

In addition to the design and specification work, the Skyline group handled several bid packages, RFP’s, Contractor evaluations, technology system assessments and integration coordination along with outside plant work to upgrade pathways, transmission media and service provider connections for CATV, Satellite TV and head-end equipment.

The project specifications and drawings were developed in accordance with the Providence College Infrastructure Standards, Industry best practices and methodologies.

 

The field support team for this project consisted of four members of The Skyline Group including Principal in Charge, Project Manager, Designer and CAD Field Support. We managed this very active design and implementation process in real-time, coordinating with members of the General Contractor, MEP and structural engineers and allied specialty trades including Hoist Controls, Signage, Local Sound and official league video.

 

 

Schneider ArenaSchneider Arena

Read More

Posted by in Project Management, Technology Consulting/Engineering

Providence College – Ruane Humanities, Providence Rhode Island

IT and A/V Systems Build-out and Commissioning

The Skyline Group provided Information Technology design, project management and construction administration services for the new Humanities Building constructed in the spring of 2012. The building was built on the south west side of the campus next to the Phillips Library and the Hickey, SOWA and Albertus building complex. Construction began in June of 2012 with a completion date of September 2013.

 

This AIA Architectural Award-Winning Project for “Outstanding Design in the Post-Secondary School Category” is a 64,000-square-foot, three-story new construction project that was designed and built from start to finish in 18 months with a budget of ~$20 Million dollars.

 

Work was completed in the summer of 2013 and ready for the start of fall semester classes. Designed and built in an architectural style to complement Providence College’s first building, Harkins Hall.

 

The Skyline team worked as owner’s representatives for the Technology and Audio-Visual Systems infrastructure and were part of the combined group of owners, architects and consultants that brought this campus showpiece to life.

Together we integrated 21st century technology systems for students, faculty and staff into this collegiate gothic styled building with architectural details and aesthetic design considerations to ensure a true to form building with the benefit of state of the art educational and technology tools, Audio-Visual applications and technology services.

 

One of the first campus installations of IEEE 802.11ac Wireless LAN Technology in the country, the building has wireless coverage throughout the premises and in adjacent outdoor classroom areas incorporating custom designed, integrated stanchions for Emergency Call “Blue Light” Phones, CCTV Cameras, Strobes and Wireless Antenna’s.

 

After the initial Programming and Design phases, the Construction Administration and Project Management was handled by the Skyline team acting as the owner’s representative. Key factors in our ability to coordinate the various MEP trades and stakeholders were our on-site, live interactions on a daily basis as the eyes and ears for the owner. We were able to adapt new technologies and systems while maintaining the architectural integrity and vision of the school, its benefactors and architectural team while adhering to a closely managed timetable.

 

In addition to design and specification work, The Skyline Group handled several bid packages, RFP’s, Contractor evaluations, technology system assessments and integration coordination.

 

Working with the A/V Consultant, the commissioning of the A/V Systems through to completion and owner acceptance was a key focus area to ensure integration and coordination of all involved systems and staff that achieved the desired objectives, system design performance and operation criteria

 


After the initial Programming and Design phases, Construction Administration and Project Management performed by the Skyline team acting as the Owners Representative were key components in our ability to coordinate the various trades and stakeholders, adapting new technologies and systems while maintaining the architectural integrity and vision of the school, benefactors and architectural teams while adhering to a closely managed timetable. In addition to design and specification work the Skyline group handled several bid packages, RFP’s, Contractor evaluations, technology system assessments and integration coordination. The Telecommunications cabling specifications and drawings were developed in accordance with the Providence College Telecommunications Master Standards.

 

19-IMG_1082   22-IMG_3064

Read More

Posted by in Project Management, Projects

Brigham and Women’s Hospital – Carl J. and Ruth Shapiro Cardiovascular Center, Boston, Massachusetts

IS Telecommunications Construction Administration and Project Management Services

 

Our responsibilities include acting as “Low Voltage Representative” for Partners Health Care’s Real Estate Group to provide general oversight of the Construction Manager and Low Voltage Contractor for both the interior and exterior connectivity, Telecommunications equipment procurement, Telecommunications equipment vendors and IS/Telecom departments. We have developed the implementation schedule and on sight documentation of the construction process relating to all telecommunications rooms “Make Ready” and equipment installation.

Read More