Higher Education Data Center

Network Core Migration and Physical Infrastructure Management                        

Summer 2015

 

This Higher Education Data Center had two key areas of focus related to their legacy infrastructure. The Network Core was in need of updating to create physical separation of key components and services for redundancy and security and the data center did not have a centralized means to gather information on the status of manageable IT infrastructure devices such as UPS, Metered Power Strips, Cooling units, and Environmental sensors.   The data center operators and managers required visibility into the managed devices with appropriate monitoring, measurement, reporting, and alerting tools to effectively operate and manage resources and systems.

 

A full evaluation of the existing data center infrastructure was performed and the results reported to the client with two suggested options for managing the physical infrastructure. Both options would allow the project to be completed on time and within budget. The client selected the option that minimized the disruption of services by utilizing pre-terminated cable assemblies to cross connect between the existing campus backbone connections and new secure network core locations. The secondary objective was to clean up pathways, eliminate large quantities of jumpers (patch cords) and organize the core cross connections. These objectives were realized with careful preplanning and staging of the work and the work was completed while maintaining the integrity of the existing campus backbone cable terminations to over 50 buildings.

The Scope of work included: Identify and develop the tasks and procedures required to support the College in the cutover of the core switches. Work with each stakeholder entity on tasks related to the cutover of the core switches and WAN services to insure completion in a timely fashion while maintaining service levels through precise scheduling and phased cutovers. Flow charting processes and tasks, provide and update network topology and as-built drawings including Cabinet Elevations, Cross-Connect Schedules and Equipment Lists. Coordinate with allied trades and internal departments on scheduling, material acquisition, preparation and staging so that all tasks associated with the completion of the cutover of the core switches could be completed according to the scheduling and service objectives on the days and times assigned. Research and provide solutions for Data Center Infrastructure Management (DCIM) including resource and component identification, manufacturer and product set evaluation and capabilities assessment, systems integration and configuration options. Participation in supplier interviews, selectivity and budget development for a phased implementation program.

Read More

Posted by in Project Management, Projects, Technology Consulting/Engineering

Confidential Banking Center– Tier III Data Center, North Carolina

Project Case Study – Tier III Data Center MEP Coordination and Design Development This multi-phased build-out of a new disaster recovery “hot site” for a global financial services company was a fast-track project with critical timetables and coordination with multiple stakeholders to bring a new site on-line while an existing facility was being decommissioned, maintaining uninterrupted services, applications and reliability. 

Read More

Posted by in News, Projects, Technology Consulting/Engineering

Providence College – New Dormitory and Fine Arts Building, Providence Rhode Island

These two projects were built at the same time and designed and bid as separate projects. The scope for these projects included the site evaluation of the current Outside Plant cabling system to determine duct bank and manhole requirements to feed both buildings and future buildings.

The design included coordination with the Providence College Telecommunications staff, the Mechanical, the Electrical and the Plumbing Engineers. The design encompassed Telecommunications outlet locations and type, space requirements for the proposed cabling system the cable tray, electrical outlet requirements at the workstations and Telecommunications Rooms (TR), lighting requirements for the TRs and pathway requirements. The Telecommunications cabling specifications and drawings were developed in accordance with the Providence College Telecommunications Standards. The deliverables included a Request for Proposal and bid package for both new buildings and the OSP as separate packages.

Read More

Posted by in News

University of Kentucky – College of Pharmacy

Tel / Data Engineering Services for the new 280,000 square foot “College of Pharmacy Building” in Kentucky with office locations, conference rooms, auditoriums, classrooms computational labs, and teaching lab space on five floors plus the basement.

Read More